Moon Dancer II is now inside and the work begins on some of the restoration projects. It was decided that the first order of work would be to reseal the cap rail along the gunwale. That became the priority as the boat was getting a bit of rain water inside. That only leads to bigger problems later, not to mention the dampness and must if she sits the way she is. Ceiling tiles have to be removed, light fixtures, some of the cabinets ... One thing leads to another. Cap rail and all fittings will be in need of repair and restoration. Also cleaning and fixing anything as we disassemble. So it begins. Maybe the winter is good to us.
Hopefully she floats again in the Spring ;-)
"And the Sea will Grant Each Man New Hope, As Sleep Brings Dreams of Home" Christopher Columbus (???) Hunt for Red October
